What is a Title 5 inspection?
Title 5 is the Massachusetts septic system code (310 CMR 15.00), enforced by MassDEP. A Title 5 inspection is a check of a septic system by a state-approved inspector to see whether it is working properly and not harming public health or the environment.
When do you need one?
- When you sell a home with a septic system. The inspection must be done within 2 years before the property transfers. [verify]
- When you change how a property is used or add bedrooms or more flow to the system. [verify]
- Some other cases, such as when a town or local Board of Health requires it. Rules vary by town. [verify]
What does the inspector check?
The inspector looks at the tank, the distribution box, the leaching area (the part that drains into the soil), and signs of backups, wet spots or failure. [verify exact checklist]
Possible results
- Pass: The system meets the standard. A passing report is generally good for 2 years. [verify, and the 3-year rule if the tank is pumped yearly]
- Conditional pass: The system works, but it needs a fix or follow-up. [verify]
- Fail: The system must be repaired or replaced, generally within 2 years of the failed report. See our page on Failed Title 5: What Happens Next. [verify]
Winter and wet weather
If the inspection can’t be done because of frozen or saturated ground, state rules may let the inspection happen within 6 months after the sale. Ask your inspector and your Board of Health. [verify]
Exemptions
Some transfers are exempt, such as between spouses, parent and child, or full siblings, or into certain trusts. [verify]
Reports
The inspector must file the report with the local Board of Health within 30 days. [verify]
Request a Title 5 inspection
[WPForms block here]
We are a referral service. Inspections are performed by independent, state-approved Title 5 inspectors. For the official rules, see MassDEP or your local Board of Health.